A template starts a project with a complete example plan for a particular kind of work, so you adapt something that already works rather than starting from nothing. You choose one when you create a project (see Getting started).

What a template gives you

Each template sets up a whole plan, written for a realistic example project:

  • an introduction and scope
  • phases with their durations, and milestones and gates with their criteria and approval authorities
  • the organisation: the parties involved and their roles, plus governance bodies in the engineering templates
  • work packages and activities, each with its phase, roles, RACI responsibilities and estimated hours
  • products, with the activities that produce them and the products they depend on
  • processes and tools

The template is applied in the background when the project is created. A notice at the top of the project shows while it's being set up, which usually takes a few seconds.

The templates

Template For
Simple Project Small internal projects such as an office relocation, a process improvement or an event. Four phases (Initiation, Planning, Execution, Closure) with two gates.
Product (Aerospace) An avionics unit or aircraft subsystem developed to ARP4754A, DO-178C and DO-254, from concept to EASA or FAA type certification and entry into service.
Product (Automotive) An ECU or automotive subsystem developed to ISO 26262 and ASPICE, from concept through A, B and C samples to start of production, with functional safety and PPAP deliverables.
Rail (Australian) State rail infrastructure such as station upgrades, level crossing removals and track duplication, aligned with ONRSR and AS/NZS standards.
Rail (UK, Network Rail) UK rail infrastructure through GRIP stages 1 to 8, with stage gates, Network Rail safety assurance and CDM compliance.
Grid-Scale Battery Energy Storage System A transmission-connected battery storage facility, from development and grid connection through design, construction and hold-point commissioning to market registration.
Major Construction (Nuclear UK) A UK nuclear new build, from Generic Design Assessment and site licensing through the nuclear safety case, construction and commissioning to full power operation.
Software (Agile, Desktop App) A cross-platform desktop application delivered in sprints, from discovery to general release, including installers and auto-update.
Software (Waterfall, Web App) A bespoke web application under a fixed-price contract, from discovery to deployment, with formal sign-off gates and change control.

If nothing fits, the Simple Project template or a Blank project is a good place to start.

Adapting a template

A template describes an example project, with example organisations and people. Work through it tab by tab and make it yours:

  1. Overview: rewrite the introduction and scope for your project.
  2. Organisation: rename the parties to your own organisations and teams, add the people in each role, and delete the ones you don't need.
  3. Lifecycle: adjust the phases, their durations and the milestones. Templates set phase durations in weeks, so if your project uses Specific dates, give each phase its planned start and end.
  4. Activities and Products: rename, delete and add to them until they describe your work. Check the roles and hours on each activity.
  5. Health Check: run it to find anything your changes have left disconnected, such as a product nothing produces any more (see Health Check).

Templates estimate hours with a single figure for each role. If you want optimistic, most likely and pessimistic estimates, switch the project's Estimation mode to three-point in Settings (see Estimating).

A template is only used when the project is created. You can't apply one to an existing project, and changes you make never affect the template.